Tuesday, 22 May 2012
Up, Up and Away.
The self erecting crane is finally in its location, the boom is 41m in length and can lift at its extremities 1000kg, the crane will be used over the next 19 weeks to lift the timber frame to its location.
Newer Post
Older Post
Home